GLG2001 | W | x | D | x | H | |
Overall | 47.2 | 19.5 | 76.8 | in. | ||
1200 | 495 | 1950 | mm | |||
Package | 49 | 24.6 | 6.5 | in. | ||
1245 | 625 | 165 | mm | |||
N.W | 108.1 lbs 49 kg | |||||
G.W | 113.2 lbs 51.3 kg | |||||
20`container 182 pcs 40`HQ 448 pcs |
GLG2002 | W | x | D | x | H | |
Overall | 35.4 | 17.7 | 27.6 | in. | ||
900 | 450 | 700 | mm | |||
Overall with casters | 35.4 | 17.7 | 33.1 | in. | ||
900 | 450 | 842 | mm | |||
Package | 38.6 | 20.9 | 34.8 | in. | ||
980 | 530 | 885 | mm | |||
3 Drawers | 32.2 | 15.4 | 3.2 | in. | ||
819 | 390 | 81 | mm | |||
2 Drawers | 32.2 | 15.4 | 3.2 | in. | ||
819 | 390 | 155 | mm | |||
N.W | 115 lbs 52.1 kg | |||||
G.W | 140 lbs 63.6 kg | |||||
20`container 44 pcs 40`HQ 132 pcs |
Standard export carton packing.
30-40 days after confirming order,detail delivery date should be decided according to
production season and order quantity.
Package Method:
golden line high quality tool trolley box cabinet paking&shipping
1. Industrial packaging: plastic bag+ kraft paper or foam+ (color) carton+ plywood pallets; / Strecth film+ corner protection+ carton+plywood pallets
2. Commercial packing: carton box with poly bag and foam
3. As the clients' requirement
Delivery Time: within 30-40 days
Shipping Port: Shanghai or others