GLMrsBig | W | x | D | x | H | |
Overall | 80.5 | 23.6 | 61.3 | in. | ||
2044 | 600 | 1556 | mm | |||
Overall with casters | 85.0 | 29.7 | 68.1 | in. | ||
2160 | 755 | 1730 | mm | |||
Package | 89.8 | 33.9 | 74.0 | in. | ||
2280 | 860 | 1880 | mm | |||
1 Drawer | 38.5 | 20.5 | 5.7 | in. | ||
978 | 520 | 145 | mm | |||
5 Drawers | 24.1 | 20.5 | 3.0 | in. | ||
613 | 520 | 75 | mm | |||
2 Drawers | 24.1 | 20.5 | 6.1 | in. | ||
613 | 520 | 155 | mm | |||
3 Drawers | 13.0 | 20.5 | 3.0 | in. | ||
330 | 520 | 75 | mm | |||
1 Drawer | 13.0 | 20.5 | 6.1 | in. | ||
330 | 520 | 155 | mm | |||
1 Drawer | 13.0 | 20.5 | 12.4 | in. | ||
330 | 520 | 315 | mm | |||
N.W | 880 lbs 400 kg | |||||
G.W | 957 lbs 435 kg | |||||
20`container 6 pcs 40`HQ 13 pcs |
Standard export carton packing.
30-40 days after confirming order,detail delivery date should be decided according to
production season and order quantity.
Package Method:golden line high quality tool trolley box cabinet paking&shipping
1. Industrial packaging: plastic bag+ kraft paper or foam+ (color) carton+ plywood pallets; / Strecth film+ corner protection+ carton+plywood pallets
2. Commercial packing: carton box with poly bag and foam
3. As the clients' requirement
Delivery Time: within 30-40 days
Shipping Port: Shanghai or others